Incident Reports

Obstruction to soil testing for bridge construction in Tanahu

2020-12-29

Gandaki, Tanahun, Byas, Ward 3

The team that came for soil testing for the construction of a bridge over the Madi River connecting Tanahu's Byas Municipality-3, Shantinagar and Byas Municipality-5, Patan was obstructed by some officials of Shantinagar Area Development Institution.

Residents of Shantinagar demanded to construct the bridge at the same place where the suspension bridge is located and the soil of the same place should be tested even when the test is already done and the team said that the construction is not possible in that area. Residents of Patan picketed Byas Municipality after obstruction for soil testing requesting Mayor to create an environment conducive to work. 

Details and Impacts
Violent / Non-violent Nonviolent
Primary Form Gherau/Dharna (sit-in)/padlocking
Primary Cause Access/control of development infrastructure (roads, bridges)
Actor 1 - Number of people 12
Actor 1 - Affiliations Protesters/demonstrators
Actor 1 - Youth unknown
Actor 2 - Number of people n/a
Actor 2 - Affiliation (Target) Local authorities (incl VDC, district, gov. line agencies at local level except education and health)
Actor 2 - Youth na
National/Online Media

0 Comments